An example is attached, where the Voltage source is controlled via a DSL block. Three different possibilities are included in the example. Import the project in PowerFactory and run an EMT Simulation.…
Tags
In order to run PowerFactory, a Licence Service that is called CodeMeter needs be installed on a Windows based machine (refer to this link for supported Operating Systems). For Single-User Editions of…
Copying the entire operational data from one scenario to another can be done very easily by activating the target scenario then using right-click, Apply on the source scenario. This copying process…
Tags
Yes, it is possible. For this task, you will have to define a new relay. This relay will represent the connection between the relays of interest. In the attached project, you will find two distance…
Tags
The objective of the attached project is to simulate and analyse the transient recovery voltage (TRV) on high voltage circuit breakers. The circuit breaker itself is modelled by means of a breaker…
Several EMT studies (transformer energisation, load rejection, ferro-resonance etc.) require a detailed model of the non-linear behaviour of the transformer iron core which is defined by its…
Tags
Depending on the available input data and the kind of study (e.g. steady state, RMS or EMT) different line models (Types) are required and available in PowerFactory. The following models are available…
Verwendung der Vorlage Importieren Sie die Vorlage Positionieren Sie die Vorlage innerhalb des Netzmodells Parametrieren Sie den statischen Generator. Achten Sie dabei insbesondere auf die Folgenden…
A PowerFactory 2018 (and onwards) example along with two papers is provided for your reference. An example of a PowerFactory implementation of a fast voltage controlled based method for converter…
The attached project demonstrates the behaviour of a full-scale converter based system while subjected to an islanding event. The converter is implemented in PowerFactory using a static generator…