Please refer to the attached files, containing an EMT-Simulation example of a three-phase three-level neutral point clamped (3L-NPC) converter. The converter controller is available in Matlab Simulink…
PowerFactory offers with the simulation scan also the possibility to observe the solver. This allows the user to define a parameter simulation scan which can stop the simulation in case of high number…
During the simulation of an Functional Mock-up Unit (FMU) generated from Matlab Simulink in PowerFactory the simulation start time needs to be set to zero (start time [attribute tstart] in the page…
The attached project is based on the medium voltage distribution network benchmark developed by Cigré (European configuration) [1]. The MV network includes two points of connection to the upstream HV…
Refer to attached example. It contains an IBR model and a three-phase fault is simulated in both RMS and EMT. The IBR model can operate in both RMS and EMT, whereas in EMT it can be changed from an…
The attached PDF gives an overview of the different modelling approaches available in PowerFactory. Please contact support before you start modelling if you are unsure about the best option for your…
Secondary arc currents occur after a fault is cleared (typically by circuit breakers) due to inductive or capacitive coupling with healthy circuits. Such currents are often experienced in long…
A power electronic converter, used in photovoltaic, wind power or HVDC application for example, has a frequency-dependent equivalent impedance, which depends on controller design and physical…
A relevant example is provided in the attached project. Please refer to the attached pdf document for a description of the model aggregation principles.…