The IEEE 13 Node Test Feeder is available as an example project within PowerFactory (File menu -> Examples... -> Tab "Examples from Literaure"). The IEEE 13 Node Test Feeder is a distribution…
A balanced load which has a grounded neutral point, i.e. with the phase technology 3PH PH-E or 3PH YN, can have a zero sequence current flow. This is obvously the case, if a zero sequence voltage is…
Open the Project Settings (Edit->Project Data->Project Settings in the Main Menu) and switch to the Input-page. Here it is possible to change the units system from Metric to English-Industry…
If you have bmp file containing fuse characteristic you can import it and digitalis it easily.  Steps that have to be done: define New Page of the type Virtual Instrument assign the bmp file to…
If you have an active maintenance contract, follow these steps: - Open the download area http://www.digsilent.de/index.php/downloads.html - Enter your email and password - Go to PowerFactory Releases…
The possibility to use the “floating license” in PowerFactory 15.0, 15.1 and 15.2 has to be given to the user by the Administrator. Therefore "Administrator" logs on to PowerFactory and enables that…
A USB dongle (hardlock) is not bound to a specific computer, so a dongle workstation licence can be used by different users on different machines, as long as the usage is within the entity the…
Generally the softkey license is bound to the machine on which it was activated and - in contrast to a hardlock - it is not intended to be moved to another machine. However, for justified cases, such…
Yes, it is possible with the remark that the new PowerFactory 2016 PF4E licence is only available as softkey. Old PF4E licences can be kept and if the university wishes to get PowerFactory 2016, it…