The attached example shows a small industrial grid where1. At 0 seconds the connection to the external grid is opened2. At 1 second the diesel unit is connected to the internal grid. Before it was…
In the attached example project the battery is connected to the grid using a PWM converter. The grid contains a synchronous machine which supplies a load. After the initialization the synchronous…
Refer to the attached project. An example of a photovoltaic (PV) system running in parallel with a synchronous generator is provided. The PV generator (Static Generator) is feeding the load. The grid…
If you want to simulate the synchronisation of two different systems, you can model and simulate both systems as separate networks. After some seconds you can then connect them with a circuit breaker…
In the attached example a ramp modeled in DSL is used to reduce the turbine power pt from its initial value to zero. You also may use a similar block structure to impose a ramp on any other machine…
It is recommended to have only more than one slack generators in the following cases: Lump representation of the external network: when you have two connections from your network and…
PowerFactory is using the rated power of the turbine as an additional input parameter to the turbine model and converts the turbine output (in turbine-p.u.) to synchronous machine p.u. at the output…
The attached project contains a small DPL example, where a controller will be created for asynchronous machines (ElmAsm). The DPL script is located inside the Scripts library. 1. Optionally it will…
The attached script should be copied to the Scripts library of your project. Usage: - Select one or more lines in a diagram or in the Network Model Manager. - Right click, select "Execute Script" and…
This DPL script will get all asynchronous machine types (TypAsmo) which are considered by PowerFactory to be relevant for the calculation. The names of types, where the calculation fails, are reported…